Skip to Content
RFPD Ltd Hydraulic Solutions
Home
Work With Us
Gallery
About Us
Case Studies
Contact
0
0
RFPD Ltd Hydraulic Solutions
Home
Work With Us
Gallery
About Us
Case Studies
Contact
0
0
Home
Work With Us
Gallery
About Us
Case Studies
Contact
2 x 37kW Offshore Power Units.
Leo Coombes 03/10/2024 Leo Coombes 03/10/2024

2 x 37kW Offshore Power Units.

Read More
Twin 55kW Power Unit.
Leo Coombes 03/10/2024 Leo Coombes 03/10/2024

Twin 55kW Power Unit.

Read More
11kW, 20 LPM, 250 Bar Power Unit for use with Water Glycol Fluid.
Leo Coombes 03/10/2024 Leo Coombes 03/10/2024

11kW, 20 LPM, 250 Bar Power Unit for use with Water Glycol Fluid.

Read More
37kW + 18.5kW Furnace Charge Machine Hydraulic Power Unit.
Leo Coombes 04/09/2024 Leo Coombes 04/09/2024

37kW + 18.5kW Furnace Charge Machine Hydraulic Power Unit.

Read More
5 x 110kW Electric Motor Drive, Hydrotester Hydraulic Power Unit.
Leo Coombes 03/09/2024 Leo Coombes 03/09/2024

5 x 110kW Electric Motor Drive, Hydrotester Hydraulic Power Unit.

Read More
Site Work – Pipe Installation.
Leo Coombes 10/11/2022 Leo Coombes 10/11/2022

Site Work – Pipe Installation.

Read More
4 x 316 Stainless Steel Tank Assemblies.
Leo Coombes 07/11/2022 Leo Coombes 07/11/2022

4 x 316 Stainless Steel Tank Assemblies.

Read More
3kW Power Unit With Accumulator / Manifold Piped to Bulkhead.
Leo Coombes 07/11/2022 Leo Coombes 07/11/2022

3kW Power Unit With Accumulator / Manifold Piped to Bulkhead.

Read More
2 x Dual 9.2kW Furnace Power Unit / 1 x 30kW Scrapcharger Power Unit.
Leo Coombes 07/11/2022 Leo Coombes 07/11/2022

2 x Dual 9.2kW Furnace Power Unit / 1 x 30kW Scrapcharger Power Unit.

Read More
30kW Power Unit with Valve Stands.
Leo Coombes 07/11/2022 Leo Coombes 07/11/2022

30kW Power Unit with Valve Stands.

Read More
Stainless Steel Refurb.
Leo Coombes 07/11/2022 Leo Coombes 07/11/2022

Stainless Steel Refurb.

Read More
30kW Power Unit with 10L Accumulator and Weather Cover.
Leo Coombes 07/11/2022 Leo Coombes 07/11/2022

30kW Power Unit with 10L Accumulator and Weather Cover.

Read More
3 x Twin 18.5kW Power Unit.
Leo Coombes 07/11/2022 Leo Coombes 07/11/2022

3 x Twin 18.5kW Power Unit.

Read More
18.5kW Power Unit For Test Rig Application.
Leo Coombes 07/11/2022 Leo Coombes 07/11/2022

18.5kW Power Unit For Test Rig Application.

Read More
11kW, 7 Station Power Unit.
Leo Coombes 07/11/2022 Leo Coombes 07/11/2022

11kW, 7 Station Power Unit.

Read More
1.5kw Power Unit With 2L Accumulator for Steel Processing Line.
Leo Coombes 07/11/2022 Leo Coombes 07/11/2022

1.5kw Power Unit With 2L Accumulator for Steel Processing Line.

Read More
5.5kW Steel Processing Power Unit.
Leo Coombes 07/11/2022 Leo Coombes 07/11/2022

5.5kW Steel Processing Power Unit.

Read More
Power Unit With Tooling Pipework.
Leo Coombes 07/11/2022 Leo Coombes 07/11/2022

Power Unit With Tooling Pipework.

Read More
6 X 4kW Power Unit at Sewage Treatment Factory.
Leo Coombes 31/10/2022 Leo Coombes 31/10/2022

6 X 4kW Power Unit at Sewage Treatment Factory.

Read More
Steel processing Line Power Unit with Valve Stands.
Leo Coombes 31/10/2022 Leo Coombes 31/10/2022

Steel processing Line Power Unit with Valve Stands.

Read More

Contact Us

Unit 3,
Turnpike Industrial Estate,
Grantham, Lincolnshire. NG31 7DF.
Tel: 07986 704 277
Email: neil@rfpd.co.uk or ben@rfpd.co.uk

Opening hours

Mon - 8am to 4.30pm
Tues - 8am to 4.30pm
Wed - 8am to 4.30pm
Thur - 8am to 4.30pm
Fri - 8am to 3.30pm

Social Links

ISO 9001 Accredited

RFPD Ltd are ISO 9001 Accredited (UKAS approved), certificate number 173889.